
"EllaLink station installation is almost done"
03.08.2020
João Nuno Ferreira, General Coordinator of the FCCN Unit, visited the Sines station, which will house the EllaLink submarine cable, and revealed some details about the structure.
03.08.2020
27.07.2020
23.06.2020
02.06.2020
03.04.2020
16.03.2020
31.01.2020
14.01.2020
11.12.2019
08.10.2019
29.08.2019
31.05.2019